Courtyard and Residence Inn
2 Overhead Traction and 4 MRL Elevator Installation, New York City, NY (In Progress)

Courtyard and Residence Inn Elevator Installation

New York, NY 10038


Courtyard and Residence Inn, 215 Pearl St. NYC, NY 10038 Elevator Installation

R1/R2 Rail Prep

R1/R2 Rail Prep

CY 1/2 Lobby Floor

CY 1/2 Lobby Floor

Rail Prep

Rail Prep


Pit Channels

Pit Channels

Temporary Hoisting Rope

Temporary Hoisting Rope

R1 Hoistway Looking Down

R1 Hoistway Looking Down


R1/2 Temporary Decking

R1/2 Temporary Decking

CY1/2 Bracket Prep

CY1/2 Bracket Prep

Brackets

Brackets


CY 1/2 Intermediate Beams

CY 1/2 Intermediate Beams

CY1/2 Temporary Decks

CY1/2 Temporary Decks

Tool Boxes

Tool Boxes


Bracket Installation

Bracket Installation

Divider Beam Bracket Installation

Divider Beam Bracket Installation

R1/2 Up Hositway

R1/2 Up Hositway


Rail Staging

Rail Staging

Bracket Welding

Bracket Welding

SE1 Pit

SE1 Pit


CY1/2 Up Hoistway

CY1/2 Up Hoistway

Work Shanty

Work Shanty

Staged Door Closures

Staged Door Closures


Staged Door Tracks

Staged Door Tracks

Staged Car Headers

Staged Car Headers

Staged Door Frames

Staged Door Frames


Staged Door Operators

Staged Door Operators

Staged Machine

Staged Machine

CY 1-2 Lobby View

CY 1-2 Lobby View


CY 1-2 Pits

CY 1-2 Pits

CY 1-2 Up Hoistway

CY 1-2 Up Hoistway

R2 Up Hoistway

R2 Up Hoistway


SE 1 Pit

SE 1 Pit

R1-2 Machines

R1-2 Machines

R1 Machine and Controllers

R1 Machine and Controllers


R1-2 Transformers

R1-2 Transformers

R1-2 Controllers

R1-2 Controllers

R2 Setting Floor Heights

R2 Setting Floor Heights


R1 Installing Subframes

R1 Installing Subframes

R1 Up Hoistway

R1 Up Hoistway


Location

215 Pearl St, New York, NY 10038

Status

Work In Progress

General Contractor

The Rinaldi Group, LLC

Architect

Nobutaka Ashihara

Consultant

Jenkins and Huntington Inc.

Scope Of Work

R 1: Overhead Traction - 39 Stops - 2000 LBS - 700 FPM
R 2: Overhead Traction - 39 Stops - 2500 LBS - 700 FPM
CY 1: MRL - 26 Stops - 2000 LBS - 500 FPM
CY 2: MRL - 26 Stops - 2500 LBS - 500 FPM
SE 1: MRL - 4 Stops - 2500 LBS - 350 FPM
P 1: MRL - 3 Stops - 2000 LBS - 200 FPM

Manufacturers Used

HM Elevator, GAL Manufacturing, Imperial Machines, Elevator Controls, Monitor, United Cabs, Hollister Whitney


Contact The Elevator Professionals Today

Elevator systems are complex and costly investments. Architects, contractors and building owners have entrusted G-Tech Elevator Associates to deliver cutting edge vertical transportation to their buildings. Whether you're in the new construction phase or modernizing an existing elevator, the G-Tech elevator experts will present you with the best options for your requirements and budget. Give us a call at 866-658-9296 or email us and put our years of experience and success to work on your project.